The project for Waterways Ireland
has been constructed as part of a restoration scheme to
re-open the canal, after it was abandoned in 1961.
Primary Fluid Power have
designed, manufactured and installed the hydraulic system to
lift the 130 tonne concrete deck.
Primary Fluid Power Ltd.
were also responsible for the complete ‘Turn Key’ project to
control the unmanned, fully automatic traffic system. |