| Bernagh Vertical Lift Bridge |
 |
Primary Fluid Power have designed, manufactured and installed the hydraulic system to lift the 130 tonne concrete deck connecting the villages of Killashee and Clondra in County Longford, Ireland Read More..... |
| |
|
|
| |
Forth and Clyde Canal New Locks |
 |
The Port Dundas re-connection scheme involves the building of two new locks between the Port Dundas and Speirs Wharf canals.
Primary Fluid Power provided the mechanical and electrical package for the project. The work consisted of the supply and installation of all lock operational equipment including the water pumping.
|
| |
|
|
| |
|
Rolling Bridge at Paddington Basin |
 |
| Hydraulics takes a new turn with this unique rolling bridge.
Designed, manufactured and installed by Primary Fluid Power. Read More..... |
| |
|
|
| |
|
 |
Linkspan dynamic position control at Holyhead |
| Primary Fluid Power provided the hydraulic control system for the vehicle access ramps ensuring the capability to meet the customer requirements |
| |
|
|
| |
|
Dutch River Swing Bridge |
 |
Primary Fluid Power designed, manufactured and installed the hydraulic system for the replacement A161 Dutch River Swing Bridge at Goole East Yorkshire
Winner of a top award for civil engineering. Read More...
|
| |
|
|
| |
|
 |
Mechanisation of Keadby Lock |
| Primary Fluid Power provided the hydraulic system for the Lock Gate and Sluice valve on the Stainforth and Keadby Canal |
| |
|
|
| |
|
| Llanthony Lift Bridge |
 |
| Primary Fluid Power designed and replaced the Hydraulic system for the Llanthony Lift Bridge on the Gloucester and Sharpness Canal at Gloucester Docks |
| |
|